Electrification works
10th January 2005
<-- Index | Showing 1-16 of 16 pictures | Index -->

1600x1200
DSCF0001.JPG
Looking towards Culdell Hill.
Looking towards Culdell Hill.
1600x1200
DSCF0002.JPG
87006 waits for a road into the up bore of the tunnel
87006 waits for a road into the up bore of the tunnel
1600x1200
DSCF0004.JPG
A general view of the stabling point area.
A general view of the stabling point area.
1600x1200
DSCF0005.JPG
Prototypical!  A push-off mast.  Sommerfeldt and the like do not have the registration arm, which is where the contact wire should really be attached.
Prototypical! A push-off mast. Sommerfeldt and the like do not have the registration arm, which is where the contact wire should really be attached.
1600x1200
DSCF0007.JPG
The Norwich end of the station.
The Norwich end of the station.
1600x1200
DSCF0043.JPG
86246 under the newly erected OHLE on the Gipping viaduct.
86246 under the newly erected OHLE on the Gipping viaduct.
1600x1200
DSCF0047.JPG
The tensioning arrangement, usually hidden under the road bridge.
The tensioning arrangement, usually hidden under the road bridge.
1600x1200
DSCF0048.JPG
Warning! goth at the controls
Warning! goth at the controls
2592x1944
DSCF0029.JPG
first shot of the main line
first shot of the main line
2592x1944
DSCF0040.JPG
scuse the background
scuse the background
2592x1944
DSCF0051.JPG
looking towards the station
looking towards the station
2592x1944
DSCF0054.JPG
headspan
headspan
2592x1944
DSCF0056.JPG
revised tensioning arrangement
revised tensioning arrangement
2592x1944
DSCF0057.JPG
goods loop gantry rebuilt
goods loop gantry rebuilt
2592x1944
DSCF0058.JPG
down end gantry
down end gantry
2592x1944
DSCF0059.JPG